GRTgaz SA and Creos Deutschland GmbH are collaborating to create a 100% pure hydrogen infrastructure, connecting the Saar (Germany), Lorraine (France) and the Luxembourg border. This 70 km-long infrastructure will be capable of transporting up to 20,000 m³/h (60 MW) of pure hydrogen via retrofitted existing gas pipelines. 

Contact: jeanmarc.brimont@grtgaz.com

GRTgaz

h2 mosahyc