ENTSOG

Secure Area Menu

ENTSOG TEN-YEAR NETWORK DEVELOPMENT PLAN 2017

TYNDP042-16 Project Data Portal Documentation Kit_ver1_211 Apr 2016
Scenarios story lines6 May 2016
TYNDP17_Supply_potentials.pdf6 May 2016

ENTSOG TEN-YEAR NETWORK DEVELOPMENT PLAN 2015

ENTSOG TYNDP 2015 – Main Report (pdf)13 Apr 2015
TYNDP022-150316_Annex_A_Infrastructure_Projects (zip)16 Mar 2015
TYNDP0027-150625_annex_A_Infrastructure_Projects – Addendum (zip)29 Jun 2015
TYNDP022-150316_Annex_B_Country_profiles (zip)16 Mar 2015
TYNDP022-150316_Annex_C_Demand_Supply (zip)16 Mar 2015
TYNDP022-150316_Annex_D_Capacities (zip)16 Mar 2015
TYNDP022-150316_Annex_E_Modelling_Results (zip)16 Mar 2015
TYNDP022-150316_Annex_F_Methodology (pdf)16 Mar 2015
ENTSOG TYNDP 2015 – Main Report (Flipbook)(external link)16 Mar 2015
ENTSOG TYNDP 2015 - Annex C1 - Country Details (Flipbook)(external link)16 Mar 2015
ENTSOG TYNDP 2015 - Annex C5 – Evolution of Demand and Supply Scenarios (Flipbook)(external link)16 Mar 2015
ENTSOG TYNDP 2015 - Annex F – Methodology (Flipbook)(external link)16 Mar 2015
TYNDP0028_150723_Analysis_Consultation_TYNDP_201523 Jul 2015
EControl_150605_Answer_consultation_TYNDP201523 Jul 2015
Edison_150605_Answer_consultation_TYNDP201523 Jul 2015
Elengy_150609_Answer_consultation_TYNDP201523 Jul 2015
EnCom_150605_Answer_consultation_TYNDP201523 Jul 2015
Eurogas_150605_Answer_consultation_TYNDP201523 Jul 2015
GasNatural_150615_Answer_consultation_TYNDP201523 Jul 2015
TAP_150605_Answer_consultation_TYNDP201523 Jul 2015
Uprigaz_150605_Answer_consultation_TYNDP201523 Jul 2015
* Press Release *ENTSOG publishes an addendum to the Annex A of its TYNDP 2015, as a follow-up of the exceptional call for projects launched in April at European Commission request (PR0090-15)29 Jun 2015
European Commission request to consider new projects in South-East Europe further mitigating the withdrawal of South Stream1 Apr 2015
TYNDP 2015 - Consultation document31 Mar 2015
* Press Release * ENTSOG launches an exceptional call for projects to be included in an addendum of TYNDP 2015. This is a follow-up of the European Commission request to consider new projects in South-East Europe (PR0082-15)1 Apr 2015
* Press Release * European Network of Transmission System Operators for Gas (ENTSOG) invites stakeholders to share their view on the Ten Year Network Development Plan (TYNDP) 2015 (PR0081-15)31 Mar 2015
* Press Release * European Network of Transmission System Operators for Gas publishes the 2015 edition of the Ten Year Network Development Plan (PR0080-15)16 Mar 2015

ENTSOG Ten-Year Network Development Plan 2013-2022

ENTSOG Final Workshop for the development of TYNDP and CBA - Agenda (Agenda)13 May 2014
ENTSOG TYNDP 2013-2022 – Submission Letter to ACER (pdf)11 Jul 2013
ENTSOG TYNDP 2013-2022 – Main Report Corrigendum (zipped pdf)10 Jul 2013
ENTSOG TYNDP 2013-2022 – Corrigendum (pdf)10 Jul 2013
ENTSOG TYNDP 2013-2022 – Main Report Corrigendum (FB) (Flipbook)(external link)10 Jul 2013
TYNDP 2013-2022 – Annex A: Infrastructure Projects Corrigendum (pdf)10 Jul 2013
TYNDP 2013-2022 – Annex A: Infrastructure Projects Corrigendum (FB Part 1) (Flipbook Part 1/2)(external link)10 Jul 2013
TYNDP 2013-2022 – Annex A: Infrastructure Projects Corrigendum (FB Part 2) (Flipbook Part 2/2)(external link)10 Jul 2013
TYNDP 2013-2022 – Annex A: Infrastructure Projects Corrigendum (e) (Excel)10 Jul 2013
TYNDP 2013-2022 – Annex B: Country Profiles Corrigendum (pdf)10 Jul 2013
TYNDP 2013-2022 – Annex B: Country Profiles Corrigendum (FB) (Flipbook)(external link)10 Jul 2013
TYNDP 2013-2022 – Annex B: Country Profiles Corrigendum (e) (Excel)10 Jul 2013
TYNDP 2013-2022 – Annex C: Supply & Demand Corrigendum (e) (Excel)10 Jul 2013
TYNDP 2013-2022 – Annex D: Capacities Corrigendum (e) (Excel)10 Jul 2013
TYNDP 2013-2022 – Annex E: Assessment Results Corrigendum (e) (Excel)10 Jul 2013
ENTSOG 7th Workshop on the European Ten Year Network Development Plan - Agenda (Final Agenda)26 Mar 2013
Welcome Speech to the participants of 7th TYNDP Workshop Jörg Tumat, Latvijas Gaze26 Mar 2013
Report on ENTSOG's 7th TYNDP Workshop Karel Beckman, Journalist10 Jun 2013
ACER Input for TYNDP 2013-2022 (7th TYNDP Workshop) Dennis Hesseling, ACER26 Mar 2013
Assessment Results (7th TYNDP Workshop) Olivier Lebois, ENTSOG26 Mar 2013
CBA Methodology - Scoping document for the Informal Public Consultation (7th TYNDP Workshop) Adela Comanita, ENTSOG26 Mar 2013
CNG/LNG fuelled vehicles - The European perspective (7th TYNDP Workshop) Matthias Maedge, NGVA Europe26 Mar 2013
Can the gas potential be harvested in the electricity market (7th TYNDP Workshop) David Viduna, CEZ26 Mar 2013
Demand and Supply Scenarios (7th TYNDP Workshop) Carmen Rodriguez, ENTSOG26 Mar 2013
Gas-to-power in electricity grid development - the German NEP as an example (7th TYNDP Workshop) Bernd Klöckl, Tennet26 Mar 2013
LNG as fuel benefits Jacques Rottenberg, Elengy26 Mar 2013
Role of gas in electrified Europe (7th TYNDP Workshop) Tomas Aminoff, Wärtsilä26 Mar 2013
Rotterdam LNG Hub (7th TYNDP Workshop) Wim Groenendijk, Gasunie26 Mar 2013
SSO: RWE Gas Storage (7th TYNDP Workshop) Zbynek Pokorny, RWE Gas Storage26 Mar 2013
Storage in Europe (7th TYNDP Workshop) Guillaume Ohannessian, EDF26 Mar 2013
The role of storage in a liberalized market (7th TYNDP Workshop) Georg Dorfleutner, RAG26 Mar 2013
* PRESS RELEASE * ENTSOG discusses their Ten-Year Network Development Plan in a public workshop in Riga (Latvia) (PR037-13)21 Mar 2013
* PRESS RELEASE * European Network of Transmission System Operators for Gas adopts the Ten-Year Network Development Plan 2013-2022 (PR035-13)21 Feb 2013
ENTSOG TYNDP 2013-2022 February Version (Corrigendum see 10 July) (zipped pdf)21 Feb 2013
TYNDP 2013-2022 - Consultation document21 Feb 2013
Edison response to TYNDP 2013-2022 consultation (Edison response)22 May 2013
EFET response to TYNDP 2013-2022 consultation (EFET response)22 May 2013
Eurogas response to TYNDP 2013-2022 consultation (Eurogas response)22 May 2013
Mutual Energy response to TYNDP 2013-2022 consultation (Mutual Energy response)22 May 2013
Reganosa response to TYNDP 2013-2022 consultation (Reganosa response)22 May 2013
TAP response to TYNDP 2013-2022 consultation (TAP response)22 May 2013
ENTSOG 6th Workshop on the European Ten Year Network Development Plan - Agenda (Final Agenda) 15 Nov 2012
1. ENTSOG TYNDP 2013-2022 - Progress report Andrea Cirlicová, ENTSOG 15 Nov 2012
10. Final remarks by ACER Damjan Zagožen, ACER 15 Nov 2012
2. Demand and Supply Scenarios Carmen Rodriguez, ENTSOG 15 Nov 2012
3. ENTSOG TYNDP 2013-2022 - Assessment of the European Gas System Olivier Lebois, ENTSOG 15 Nov 2012
4. Gas Regional Investment Plan South North Corridor (FR-DE-IT-CH-BE) M. Gazzola, SNAM Rete Gas / N. Grégoire, Fluxys 15 Nov 2012
6. Preparatory phase for identification of projects of common interest Kitty Nyitrai, DG ENER 15 Nov 2012
8. Winter Supply Outlook 2012/13 Olivier Lebois, ENTSOG 15 Nov 2012
9. Winter Review Carmen Rodriguez, ENTSOG 15 Nov 2012
5. GRIPs - Overview 2013 Andrea Cirlicová, ENTSOG 15 Nov 2012
7. CBA methodology Adela Comanita, ENTSOG 15 Nov 2012
* Press Release * European Network of Transmission System Operators for Gas (ENTSOG) has presented the methodology for its TYNDP 2013-2022 and launches the call for information on projects to be covered in the report (PR023-12) 27 Jun 2012
Infrastructure Projects Questionnaire for TYNDP27 Jun 2012
ENTSOG 5th Workshop on the European Ten Year Network Development Plan - Presented Materials (TYNDP5 WS Presented Materials) (expected)20 Jun 2012
6th SJWS: Stakeholders' input (Market Integration and Security of Supply) (expected)29 May 2012
ENTSOG preparatory material (Market Integration and Security of Supply - updated sceanrios and proposed indicators)26 Apr 2012
7th SJWS: Stakeholders' input (Supply approach and conclusion on TYNDP concept) (expected)29 May 2012
ENTSOG preparatory material29 May 2012
5th SJWS: Stakeholders' input (Demand and supply) (TYNDP003-12)20 Apr 2012
ENTSOG preparatory material (Demand proposal)20 Apr 2012
ENTSOG proposal (updated draft questionnaire)20 Apr 2012
4th SJWS: Stakeholders' input (Security of Supply and Market Integration initial proposals) (TYNDP005-12)20 Mar 2012
ENTSOG preparatory material (demand case labeling)20 Mar 2012
ENTSOG preparatory material (initial proposals)20 Mar 2012
3rd SJWS: Stakeholders' Input (Demand) (TYNDP002-12)8 Mar 2012
ENTSOG preparatory material8 Mar 2012
Entsog preparatory material8 Mar 2012
Entsog presentation on demand8 Mar 2012
* Press Release * European Network of Transmission System Operators for Gas (ENTSOG) launches a new inititiative as part of it Ten-Year Network Development Plan process. (PR015-12)15 Feb 2012
2nd SJWS: Stakeholders' Input (Network & Market Modelling, Security of Supply, Market Integration) (TYNDP001-12)15 Feb 2012
ENTSOG presentation on Market & Network Modelling15 Feb 2012
ENTSOG presentation on Security of Supply and Market Integration15 Feb 2012
1st SJWS: Stakeholders' Input (Infrastructure Projects, Supply, Demand) INV100-1224 Jan 2012
TYNDP Infrastructure Questionnaire Template (INV023-10) (expected)24 Jan 2012
ENTSOG presentation24 Jan 2012
* Press Release * European Network of Transmission System Operators for Gas (ENTSOG) calls on stakeholders to sign up for participation in SJWSs as part of the process of development of ENTSOG Ten-Year Network Development Plan (TYNDP) 2013-2022. (PR012-11)15 Nov 2011
ENTSOG TYNDP 2013-2022 Project Plan, incl. call for participants in SJWSs (INV080-11)15 Nov 2011

ENTSOG Ten-Year Network Development Plan 2011-2020

Corrigendum to TYNDP 2011-2020 18 Jul 2011
ENTSOG TYNDP 2011-2020 Consultation Document 25 Mar 2011
Response by EFET 18 Jul 2011
Response by EdF 18 Jul 2011
Response by Edison 18 Jul 2011
* PRESS RELEASE * European Network of Transmission System Operators for Gas adopts the Ten-Year Network Development Plan 2013-2022 (PR035-13)21 Feb 2013
Response by Elengy18 Jul 2011
Response by Eurogas 18 Jul 2011
Response by STMFC 18 Jul 2011
Response by TAP 18 Jul 2011
Response by Tauerngasleitung 18 Jul 2011
Response by Wärtsilä18 Jul 2011
3rd ENTSOG TYNDP Workshop (presented materials available at http://www.entsog.eu/events/tyndp3/presented.html ) 17 Mar 2011
ENTSOG Ten-Year Network Development Plan 2011-2020 17 Feb 2011
Annex D: Data tables: Infrastructure Capacity 28 Jan 2011
Annex A: Infrastructure Projects 28 Jan 2011
Annex B: Country/TSO Profiles (INV031-10) 28 Jan 2011
Annex C: Data tables; IP, LNG, Production, Storage, Demand, Supply 28 Jan 2011
Annex E: Modelling results and remaining flexibility 28 Jan 2011
Questionnaire on Gas Infrastructure Projects (INV023-10) 5 Jul 2010

ENTSOG Ten-Year Network Development Plan 2010 - 2019

Memo of the 1st ENTSOG Workshop on the European Ten Year Network Development Plan - 26 January 2010, Brussels (INV-001-10) 4 Feb 2010
ENTSOG European Ten Year Network Development Plan 2010 - 2019 (09-ENTSOG-002) 23 Dec 2009
ENTSOG European Ten Year Network Development Plan 2010 - 2019 Attachment A : Capacity Development, Demand and Supply Scenarios by Country (09-ENTSOG- 002) 23 Dec 2009
ENTSOG European Ten Year Network Development Plan 2010 - 2019 Attachment B : European Peak Day Analysis (09-ENTSOG-002) 23 Dec 2009
INNER 061 Image courtesy of GAZ-SYSTEM
System Development